الوصف
Exposed electric supply in right of way. Been open and uncovered for weeks.
سئل أيضا...
Q. Is this issue visible from the public right of way? Code Compliance may not be able to follow up on anonymous issues not visible from a public area.
A. Yes
A. Yes
4 تعليقs
City of Bainbridge Island (تم التحقق رسميا)
Jay Harris (تم التحقق رسميا)
Nicole Retana (تم التحقق رسميا)
مغلق Peter Corelis (تم التحقق رسميا)
The Public Works' construction inspector noted the job is still waiting for PSE to hookup power and inspect the trench. We will reach out to the contractor to cover the hole in the meantime.
Thank you,
Peter Corelis, City Engineer
pcorelis@bainbridgewa.gov